Plumbing a drain pipe question? - spa plumbing diagram

I will simplify for easy configuration explination ;-)

Basically it is a 36x40 pole barn sits on a concrete slab - fully completed a business (she ran out). Longway sits on the ground (soil) and waste water from the city is the right rear of the building.

I need outlets (as in the case) of wells, which ran throughout the building - with the exception of the front.

I also have two mounted in the center front of the building and two in the posterior half, but on the ground.

How can I get without tearing the whole place? How do I fix the crash in the distance? What about the floor - is a concrete slab? (I know it's difficult, but how do I do? "Any suggestions?

A spa day is in the building is the reason for everything.

5 comments:

  1. Try to keep the entire facility at a location on the back sounds good, you can provide a false wall on all pipelines, install, run LTHE pipes in the same camp. but. A response to other sounds as well, raising the upper floor
    but it would mean raiseing on all doors.
    false walls sounds a lot less than I

    ReplyDelete
  2. This project involves the cutting and drilling under the plate. Now may be time for a professional call.

    ReplyDelete
  3. As with any commercial building where I work, or if someone moves in space as a lease in the parade of concrete saws

    ReplyDelete
  4. If ceiling height allows, it looks so out of the ground today should be installed in areas sanitary and you need a double bottom, if you want] level [a] value [or can be eliminated by increasing the pelvic floor. Fresh water penetrates through the wall and water is slowly from the slope to an outlet on the wall next to the sewage system sounded.
    There are also possibilities of the wastewater through the pipe wall by a pump / tank system. A very important project, which could be the medium.
    My best and good luck.

    ReplyDelete
  5. A sink drain pipe is on the inner wall of the building along the entire length of 1 / 8 "per foot, use a taut string running and follow the slope. On the ground, begin to destroy the concrete. Zit is the same level, but preferably with a slight tendency to channel interface.